This unprecedented Integrated Flood Hazard Management Plan systematically considers and responds to the interplay of physical, economic, social, and environmental
To ensure the essential stream for the treatment of contaminated materials dismantled from the turbine hall and controlled area of
Turkey is working towards good environmental status for water bodies, ensuring water efficiency, and developing economic instruments for this goal.
Reclaiming six hectares of land from the sea, resulting in a 3% increase in the surface area of the principality
Memve’ele Hydroelectric Project is a diversion-type hydropower station with its open channel located on the Ntem River, South Region, Cameroon.
A $50M electrical and civil infrastructure upgrade, a necessary foundation for future campus development at the British Columbia Institute of
The park revitalises a once-sacred creek and reduces flood risk with inspired art, splendid paseos, native plantings, unique plazas, places