Operation of Lai Chau HPP has increased total installed capacity of hydropower plants on the main course of Da river
The first in the world VVER-1200 generation 3+ reactor, able to remain safe in a coolant loss situation. Safety is
To ensure the essential stream for the treatment of contaminated materials dismantled from the turbine hall and controlled area of
To meet the increasing peak hour demand for power, an additional power block was constructed and commissioned The combined cycle
Memve’ele Hydroelectric Project is a diversion-type hydropower station with its open channel located on the Ntem River, South Region, Cameroon.
A $50M electrical and civil infrastructure upgrade, a necessary foundation for future campus development at the British Columbia Institute of
An extremely challenging power grid project operating under extreme environmental conditions in areas of high altitude, low air pressure, scarce
The world’s largest diversion type power station, it has a capacity of 4,800MW giving multi-year average annual generation of 24.23TWh,
Suzhou City has the highest gross value of industrial output and at the prefecture-level, is the city with the largest
A pivotal project for the middle and lower reaches of the Lancang River Basin, created for power generation, flood control,