Located along Peusangan River in Aceh province, two hydroelectric power stations form a cascade system using routed overflows from Lake
One project providing reliable renewable energy capacity alongside a big local impact on the communities around it. Despite the rapid
The transit line includes 9.8km of elevated sections, 13 stations and 5.9km of underground tunnels to preserve the landscape and
To meet the increasing peak hour demand for power, an additional power block was constructed and commissioned The combined cycle