Project Category: TransportationProject Tags: Highways Vietnam
Built to meet future traffic needs and designed to connect three major roads – HaLong-VanDon expressway, to BachDang bridge, and NH18.
Minh Khai interchange was designed to ensure traffic capacity for future economic growth in the in the QuangNinh province, ensuring safety and convenience for communities.
The intersection is designed in a completed asterisk form, with separate branches for each direction, minimizing intersection conflicts and increasing safety during operation. As part of future-proofing, it has been built with capacity for future upgraded and renovation.
Loading...
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.
GOAL 9: Industry, Innovation and Infrastructure: Yes
Engineering companies involved:
Transport Engineering Design Inc - TEDI
Client organisation:
Quang Ninh Provincial Transport Construction Project Management Unit