The Kazungula Bridge (Road cum Railway) Construction Project is a multi-nation and border crossing project. It comprises a total length of
6.371 km.
In addition, One-Stop Border facilities (OSBP) were constructed as part of the Kazungula Project
A Joint Venture of 6 International and local consulting firms pulled from their wealth of professionals to form a team that executed their technical responsibilities in what must be recognized as a masterful showcase of International Co-operation. As an international bilateral project shouldering immense economic promise for both countries; transparency and integrity were essential for delivery. Checks and balances within the Consulting Joint Venture and the Client as well as various Stake Holders ensured an ethical and transparent project. A hallmark of the project. Efficient Quality Control mechanisms were
practiced leading to several achievements in quality as per the respective design specifications.
Concerning construction safety; the project achieved its target of over 10 million hours free of Lost Time Injuries. The Project implemented a rigorous Environmental Monitoring System that monitored water pollution, Aquatic Ecology, Noise, Air, Human Wildlife Conflict, etc. This led to a successful environmentally executed mega Project.
The Project has a Bridge Health monitoring system in operation as well as weather measuring devices that will contribute to the need for data availability when pushing forward the Green Infrastructure agenda. The local community can now cross the border for trade without risk of suffering loss on the Zambezi River.
Sorry, no records were found. Please adjust your search criteria and try again.
Sorry, unable to load the Maps API.
Nippon Koei Co. Ltd
Gibb
Bothakga Burrow
CPP Botswana
Zulu Burrow Development Consultants Limited
Road Transport and Safety Agency Zambia
Ministry of Transport and Communications Botswana